Tuesday, February 11, 2014
The Greenwich Frame Part IV Completion Presentation
The finished frame, ready to be accessorized. |
Apparently, I can cut matting. |
Assembly consisted of washing & installing the plate glass followed by the matting (with the picture taped to the back) and then a simple piece of peg board. I used window glazing points to hold the whole assembly in. I then attached a wire to hang the frame with using #6 x 3/4" pan head screws.
The back of the completed frame. |
The completed, assembled frame. |
The whole Greenwich Frame Saga:
The Greenwich Frame, Part I: Design
The Greenwich Frame, Part II: Fabrication Begins
The Greenwich Frame, Part III: Plugging Away
Labels:
completion,
frame,
greenwich,
iv,
part,
presentation,
the
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment